Security
Engineering considerations
- Imaging and RF signal integrity
- Camera and radar modules are sensitive to impedance consistency and crosstalk. Impedance is controlled to ±5%. Length matching and differential routing are coordinated at stack-up stage.
- Outdoor environmental tolerance
- Outdoor security hardware faces temperature-humidity cycling and salt spray, so surface finish choice and solder-mask adhesion matter more than process limits. ENIG, immersion silver and lead-free HASL are available.
Applicable board types
The board types below are the ones that come up most often in security applications. Each link goes to that board type's capability page with material, layer-count and process ranges. Combined constructions such as hybrid lamination or embedded copper are also available.
Production experience
Related end-product categories already in volume production include Documented end-product categories in security include intelligent monitoring systems and radar.. Specific project details are covered by non-disclosure agreements and are not published.
Applicable certifications
- ISO 9001:2015 Quality Management System — 120622-2012-AQ-RGC-RvA
- ISO 14001:2015 Environmental Management System — F027-2026-E-00285-R5-05
- RoHS Restricted Substances Test Report — WTH23H12270526C
- REACH SVHC Test Report — WTH24H10245077C
- UL Recognized Component (USA) — Wiring, Printed — E326765 (ZPMV2)
- UL Recognized Component (Canada) — Wiring, Printed — E326765 (ZPMV8)
Frequently asked questions
- How long does a security project take from enquiry to prototype?
- Quotations are returned within 30 minutes as a rule. Expedited prototype lead times run by layer count: double-sided 24 hours, 4-layer 48 hours, 6–8 layer 72 hours, 10–12 layer 96 hours; single-stage HDI at 6 layers is 48 hours. Volume lead times are set by order quantity.
- Which inspection and material documents can you supply?
- As standard we supply a certificate of conformance, material certifications with lot records, and electrical test records; impedance test reports and microsection analysis are available on request. Acceptance can be run to IPC-6012 Class II or Class III, which must be stated on the order.
Stack-up, materials and acceptance criteria are confirmed per project.
Routine enquiries are answered within 30 minutes. Once you upload Gerber files and technical requirements, engineering returns manufacturability findings together with the quotation, so design conflicts surface before production rather than after.
